Industries · Cloud & Hyperscale

For the operators
landing the Kingdom.

Build-to-suit campuses, customer-procured PPAs, and the engineering culture to integrate with hyperscaler PMOs. Serving AWS, Azure, Google, Oracle, Alibaba, and the next wave of cloud operators entering KSA.

The challenge

Saudi Arabia is the next hyperscale frontier — and the timeline is tight.

Every major hyperscaler is now committing public capacity targets in the Kingdom. The Vision 2030 timeline for sovereign cloud regions, the demand profile of regional AI initiatives, and the compute commitments behind HUMAIN, NEOM, and other anchor programs are pulling forward what would otherwise be a five-year buildout into a two-year race. The constraint, repeatedly, is colocation capacity engineered to hyperscaler standards. That is the gap we exist to close.

  • Sovereign cloud region commitments are accelerating ahead of internal capacity plans.
  • Customer-procured PPAs require operators with the engineering bench to execute them.
  • Build-to-suit campuses require land control, permitting expertise, and EPC capability — all of which the hyperscaler procurement playbook expects from the local partner.

Technical specifications

What you're committing to.

Hyperscale Engagement · Capability Profile
Lease size range
5 MW — 50+ MW per campus
Lease term
10–15 years standard
Build-to-suit lead time
12–18 months greenfield
Land control
Dedicated parcels available
PPA model
Customer-procured supported
Network
Dedicated cross-connect halls
Compliance
NCA, SAMA, Vision 2030 frameworks
SLA
Hyperscaler-tier custom available

How we serve hyperscalers

The capabilities that matter on RFP day.

Sovereign cloud region delivery

Build-to-suit campuses for hyperscaler sovereign cloud regions, with KSA data residency and customer-controlled security perimeter.

AI region capacity

Immersion and DTC capacity engineered for the GPU densities behind hyperscaler AI region launches.

Carrier-neutral MMR

On-net cross-connects to all Saudi carriers plus dedicated cross-connect halls for hyperscaler internal fiber.

PMO integration

Our engineering and program teams integrate directly into your construction PMO. Customer-controlled milestones.

PPA facilitation

Customer-procured PPAs structured with the hyperscaler as named offtaker. We facilitate; you control the contract.

Security perimeter

Dedicated land parcels, customer-controlled physical security, and Saudi-cleared operations options.

Engagement model

How a typical hyperscale engagement runs.

RFP response

Two-week turnaround on standard RFPs. Detailed engineering response with land options, power, network, security, and construction sequencing.

Joint design + BTS

Joint design workshop with your infrastructure team. Build-to-suit lease executed with milestone-tied progress payments and customer-controlled gate reviews.

Live delivery

Customer-witnessed commissioning. Tier III certification through Constructed Facility. Hand-off ready for first power-on, with operations integrated into your existing tooling.

Capacity is being committed daily.
Reserve yours.

Tour the facility. Talk to engineering. Get a precision quote. We respond to qualified inquiries within one business day.

Olaya District, Riyadh · Open for tours by appointment