Insights

Field reports from the
AI infrastructure frontier.

Engineering deep-dives, market analysis, sustainability briefings, and company perspectives from the team building the Kingdom's AI compute backbone. Written by the people doing the work — not by a marketing team.

engineering 12 min

Why immersion cooling is no longer optional for AI training clusters

NVIDIA H100 GPUs draw 700W. B200 modules draw over 1,000W. A single AI training rack now exceeds 100kW — eight times what a traditional data center was built to dissipate. We walk through the thermodynamics, the operating economics, and the design choices that made dielectric immersion the only viable path for serious AI compute.

Khanh Ho Si
Chief Technology Officer
market 18 min

The economics of GPU compute in the Kingdom: a 2026 capacity outlook

An honest look at what GPU compute will cost in Saudi Arabia over the next 36 months — what's driving demand, where the supply constraints are, and how power, land, and capital intersect with hyperscaler procurement timelines. Includes our internal capacity outlook through 2029.

Tobias Hooton
Board Advisor — Strategy
engineering 14 min

From design to operations: how we earned three Uptime certifications in 18 months

A field report from the engineering team. The pre-design discipline that pays off at certification. The four mistakes most operators make on Tier III Design submission. The audit prep cadence that turned what is normally a six-month back-and-forth into a clean first-pass approval.

Ahmad Mansour
Executive Director, Engineering
company 9 min

Inside our 187 MW buildout: a site visit

A walk-through of the active facility — from the substation step-down to the immersion gallery floor. Photographs, build sequencing, and the why behind some of the less obvious design choices visitors notice on a tour but don't always get explained.

Editorial team
market 11 min

Sovereign AI: what KSA’s data residency requirements mean for global cloud architecture

A briefing on the Kingdom's data residency, classification, and sovereignty requirements as they apply to cross-border AI workloads — and the specific architectural patterns that satisfy them without compromising training throughput.

Dr. Kholood AlNutaifi
Strategic Advisor
sustainability 10 min

PUE is dead. WUE is dying. The new metrics for AI-era facilities

PUE was a useful proxy for the air-cooled era. It rewards facilities for being efficient at the wrong things in a 100kW/rack world. Here is the metric stack we run on internally — and the one we believe will become the operating-floor standard by 2028.

Paul Morisson
Strategic Advisor
engineering 13 min

Hot-aisle to liquid: a retrofit playbook for legacy enterprise data centers

For enterprise teams sitting on a 5–15MW air-cooled estate that needs to host AI inference: a sequenced retrofit plan from hot-aisle containment through DTC, with the structural, plumbing, and operational gating items most teams underestimate.

Engineering team
market 15 min

Power agreements in the Kingdom: a guide for hyperscaler procurement teams

How power procurement works in KSA — utility structure, PPA mechanics, the renewable integration roadmap, and the contractual levers hyperscalers should be negotiating into their wholesale leases.

Robert Karssiens
Strategic Advisor
engineering 16 min

The 30-year arc of data center cooling — and where it goes next

From CRAC units to hot-aisle containment to liquid. A look back at three decades of thermal management in commercial data centers and a thesis on the next decade — including why two-phase immersion is closer than the market thinks.

Dan Scarbrough
Strategic Advisor

Capacity is being committed daily.
Reserve yours.

Tour the facility. Talk to engineering. Get a precision quote. We respond to qualified inquiries within one business day.

Olaya District, Riyadh · Open for tours by appointment